WebbEX-10.1 2 d584968dex101.htm EX-10.1 EX-10.1 . Exhibit 10.1 . ENGINEERING, PROCUREMENT AND CONSTRUCTION AGREEMENT . THIS AGREEMENT (“Agreement”) is made and entered into as of the 12 th day of August, 2013 (“Effective Date”) between El Dorado Ammonia L.L.C., an Oklahoma Limited Liability Company (“Owner”) and SAIC … WebbEstimated reboiler area, Areb = Qr/ (600*27.4) = 400789/ (600*27.4) = 24.4 m2 Taking 20% excess, reboiler area will be, Areb’ = 24.4*1.20 = 29.3 ~ 30 m2 For partial condenser we can calculate cooling water requirement as below. We will take Condenser cooling water outlet temperature at 38 0 C.
Sour water strippers: design and operation
WebbReboilers The reboiler, as the name implies, is a device used to replenish the heat lost by a process commodity. From:Pipe Drafting and Design (Fourth Edition), 2024 Related … WebbSkip to content. Menu. Home; Branchwise MCQs. Programming; CS – IT – IS. CS fiche ddhc
Discover how you can improve sustainability - Alfa Laval
Webb6 apr. 2024 · Potential operating conditions are pressure between 2.7 and 10.9 atm, with a condenser temperature between 60 to 121 °C and a reboiler temperature between 119 and 180 °C. The reaction window is reduced since temperatures between 110 and 150 °C favor main reactions over side reactions. Webb10 apr. 2024 · In 1997, Nakaiwa et al. [7] showed that HIDiC could decrease the energy consumption even more than the condenser/reboiler heat-pumps [7]. After that, more studies on exergy loss analysis were performed showing low exergy loss and high energy efficiency of HIDiC to reduce total energy consumption by about 30–50% in separating … WebbCORPORATE CRITERIA PROCESS PIPE SIZING Doc. No. CR-COR-ENG_PRC-002-E Rev. 01 Date 28/02/13 Page 11 of 48 4.1.6 Overall cost optimization The final choice of the pipe diameter should be done by optimization of the overall cost: installation cost plus operating cost. Installation cost increases for large diameters, while operating cost … greg tapp printing newcastle